Blackout provided rigging and draping for the spectacular 2011 MTV EMA held in Belfast.
MTV EMA’s spectacular set (designed by Es Devlin), transformed Belfast’s Odyssey Arena with a complex combination of curved scenery at both ends and technical production equipment.
Blackout providing the Kinesis automation system controlling over 50 motors in the venues roof alongside PRG. Blackout also supplied all of the truss, 150m of pipe and drape for the main show and additional equipment for the other show and after-party venues.
